Customization: | Available |
---|---|
After-sales Service: | Online Support and Overseas Service |
Driven Type: | Electric |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Application | Isolation wire winding to achieve high shielding effect | Spindle speed | 800RPM/min |
Voltage | Voltage: three-phase 380V 50HZ | Core wire pay-off shaft size | 400mm-500mm |
Cable supply reel size | 630~800mm | Tension control range | Tension control range 50-2000g |
Winding copper wire diameter | ±0.1-0.2mm | Twist distance range | electronic twist distance (5-40MM) |
1.Q: Who are we?
A: Dongguan Chuangzhan Machineny Co., td, a professional wire and cable equipment manufacturer with 21 years of experience in industry and trade. It only takes 1 hour from our company to the nearest Shenzhen airport. Welcome to visit our company!
2.Q: Are you the manufacturer or trading company?
A. We are industry and trade integration. We have three factonies with a total area of 66,000 square meters, located in Dongguan, Hubei and Huizhou.
3.Q: How can l get quotation and make order?
A. Send us your requirements and we will give you the most suitable specifications and accurate quotation
4.Q: How long will the delivery time take?
A: About 90 days.
5.Q: How about the after-sell service?
A: We provide one-year waranty and lifetime maintenance after-sales service.
6.Q: What are the terms of payment
A.:A deposit of 30% wil be paid in T/T within 7 days of signing this contract and the remaining 70% wil be paid in T/T upon delivery.
7.Q: Do you provide any other services?
A. installation and employee training services. We also have an overseas after-sales team to ensure after-sales service
8.Q: How to ensure the normal operation of the equipment?
A. Please don' worry. Afer the equipment is assembled. we wil provide two trial running opporunies. You could come to our factory with your engineers or technicians to test the equipment in person.The equipment will be shipped after the test is successful. We wil send a special person to your factory to install the equipment. After the installation, we will test the equipment on site to ensure the normal operation of the equipment.